VerbatimParliament, as it happens

Armoured Fighting Vehicles

Asked by Ben Obese-JectyConservativeMinistry of DefenceTabled Answered 8 September 2026UIN 23268

The question

To ask the Secretary of State for Defence, with reference to the National Infrastructure and Service Transformation Authority Major Projects Annual Report 2025 to 2026, Tables, Armoured Cavalry 2025, whether a re-approval is required following the Ministerial decision on the programme’s future.

Answered by Ministry of Defence

In conjunction with General Dynamics, the Demonstration phase timetable is being considered as part of the Department's wider assessment of the programme. Future approval requirements will also be considered as part of that assessment.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim