West Coast Main Line: Timetables
The question
To ask the Secretary of State for Transport, what number of trains per week from a) London to Manchester and b) Manchester to London were on the timetable in i) 2024, ii) 2025 iii) January to June 2026 iv) July to December 2026 and v) are planned for 2027.
Answered by Department for Transport
Please see below Manchester services per timetable over this period.
| Jun-24 | Dec-24 | May-25 | Dec-25 | May-26 | Dec-26 | May-27 | Dec-27 |
| SX / SO / SU by timetable period | |||||||
London - Manchester | 46 / 42 / 33 | 46 / 42 / 33 | 46 / 42 / 33 | 47 / 42 / 33 | 47 / 42 / 33 | 47 / 42 / 33 | 47 / 42 / 33 | 47 / 42 / 33 |
Manchester - London | 47 / 44 / 33 | 48 / 44 / 33 | 49 / 44 / 33 | 49 / 44 / 33 | 49 / 44 / 33 | 49 / 44 / 33 | 49 / 44 / 33 | 49 / 44 / 33 |
Total | 93 / 86 / 66 | 94 / 86 / 66 | 95 / 86 / 66 | 96 / 86 / 66 | 96 / 86 / 66 | 96 / 86 / 66 | 96 / 86 / 66 | 96 / 86 / 66 |
Weekly Total | 617 | 622 | 627 | 632 | 632 | 632 | 632 | 632 |
SX = Weekdays
SO = Saturdays
SU = Sundays
Please note, that from Monday 20th July to Friday 28th August Avanti operated a Customer Led Timetable, designed to better match the timetable with reduced summer demand. As a result, 10 Manchester services every weekday were removed, reducing the weekly total to 582.
The Customer Led Timetable has now ended, so the full timetable is in operation to Manchester.
Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →